Advantages of floor equipment
LouCheng plate equipment operation is simple and the speed is quick, workbench has six LouCheng board equipment process, (namely the six-party wheel) of table, have a first-class mechanical index, positioning, also set up a set of precise positioning, fully ensure every time stamping process, the workbench mould of accurate positioning, install the sliding table is enclosure structure of upper die, slide guide and fuselage on the guide, contact length, upper die each time stamping, process of mud billet secondary stamping on the moulding tile billet in place after the upper die 10 ㎜ rise, make the mud after they were fully exhaust, mould pressing down on them again on tile billet in place, did not return to the position, so die service life is long, The quality of the pressed products is good.
The equipment of floor bearing plate should install the steel beam below and then lay the floor bearing plate on the steel beam. As for welding: laying LouCheng board and steel beam connections, the end of the steel beam and the fusion welding, the middle stud and steel welding, LouCheng plate hole with special clamping pliers bite pressure between connection, plug with special galvanized plug board and LouCheng plate and beam spot welding. If the floor slab with arc area is cut by plasma cutting machine, the cut is smooth and the surface galvanized layer is complete. Floor bearing equipment will be equipped with a set of lubrication system, when the machine runs, all bearing bearings, transmission gear mechanism movement guide rail and other parts of the automatic refueling.
How to use fully automatic tile press to be able to use for a long time? First of all, we must remember the maintenance manual of the press. It's good for the tile press to do what we should do every day. To clean the surface of LouCheng board equipment, die stamping process on the machine: by motor through the pulley, drive the input shaft, the pinion, big gear, shaft drive, through a set of driving CAM mechanism with upper die slide up and down, realize the pressure. The operation of floor bearing plate equipment is introduced simply. The floor bearing plate equipment should install the steel beam below and then lay the floor bearing plate on the steel beam. As for welding: the floor slab is laid and connected with the steel beam, the end of the plate is welded with the steel beam through penetration welding, the bolt is used in the middle and the steel beam is welded through penetration.